| SKETCH NOTES |
|
NOTE |
"PPL" and "Company" will be changed to "PPL EU", "PPL's" and "Company's" will be changed to "PPL EU's". |
|
NOTE 1 |
All updated sketches have been redrawn for clarity using a new format. |
|
NOTE 2 |
The 3 phase, 4 wire, 240-single phase 120/240 volts service is now referred to as 3 Phase, 4 Wire, Delta 240/120 Volts. |
|
NOTE 3 |
Are changing the terms ' meter trough' to 'meter base' and 'meter mounting' to 'meter panel'. |
| Sketch # |
2009 Changes, Updates and Additions |
| 15A |
06/24/09 Updated format, rule references and updated drawing |
| 21 |
06/24/09 Updated format, rule references and updated drawing |
| 60 |
03/25/09 Corrected Wording in Note J
03/6/09 Added Note J |
|
61 |
03/25/09 Corrected Wording in Note J
03/6/09 Added Note J |
| 70 |
03/25/09 Corrected Wording in Note D
03/6/09 Added Note D and expanded rom two sheets to three sheets |
| 72 |
03/25/09 Corrected Wording in Note N
03/6/09 Added Note N |
| 73 |
03/25/09 Corrected Wording in Note I
03/6/09 Added Note I and expanded rom two sheets to three sheets |
| 80 |
03/25/09 Corrected Wording in Note I
03/6/09 Added Note I |
| 81 |
03/25/09 Corrected Wording in Note I
03/6/09 Added Note I |
| 82 |
03/25/09 Corrected Wording in Note I
03/6/09 Added Note I |
| 83 |
03/25/09 Corrected Wording in Note I
03/6/09 Added Note I |
| Sketch # |
2008 Changes, Updates and Additions |
| 7A |
12/05/08 Updated format. Remove Manufacture List (Replaced by Slip Riser Table), changed hole size of Note E and F from 1-1" hole to 2-1/4" holes |
| 8B |
09/17/08 Updated format, rule references and updated drawing |
| 14 |
09/17/08 Updated format, specified note C is not for PPL EU Cables |
| 14A |
12/5/08 Update format. Update Title
09/17/08 Updated format, updated drawing to show 3 fingers |
| 14B |
09/17/08 Updated format, specified note C is not for PPL EU Cables |
| 14C |
09/17/08 Updated format, and updated drawing |
| 14D |
09/17/08 Updated format, and updated drawing |
| 15 |
09/10/08 Updated format; specified note C is not for PPL EU Cables |
| 15A |
09/10/08 Updated format, specified note C is not for PPL EU Cables |
| 25 |
09/17/08 Updated format and rule references |
| 25A |
09/17/08 Updated format and rule references |
| 25B |
New Sketch |
| 25C |
New Sketch |
| 25D |
New Sketch |
| 41 |
12/5/08 Updated format. Add Reference to REMSI Rule 12 |
| 41A |
12/5/08 Updated format. Add Reference to REMSI Rule 12 |
| 41B |
12/5/08 Updated format. Add Reference to REMSI Rule 12 |
| 41C |
12/5/08 Updated format. Add Reference to REMSI Rule 12 |
| 47 |
09/10/08 Updated format; added timber option to sketch |
| 49 |
09/10/08 Updated format; removed Frankel AML Series; revised drawing to show 4 mounting holes |
| 55 |
12/05/08 Update Format, updated sketch to specify Horizontal Distances between the Electric Meter and the Gas Meter/Regulator/Relief Valve |
| 55A |
12/05/08 Update Format, Change Title, added Note E and F, added references |
| 60 |
12/05/08 Changed hole size of Note F and G from 1 - 1" hole to 2 - 1/4" holes
05/13/08 Meter box to meter base
04/07/08 New Sketch |
|
61 |
12/05/08 Changed hole size of Note F and G from 1 - 1" hole to 2 - 1/4" holes
05/13/08 Meter box to meter base
04/07/08 New Sketch |
| 70 |
04/07/08 New Sketch |
| 71 |
12/05/08 Added Note 1, added references
04/07/08 New Sketch |
| 72 |
12/05/08 Added Note M, added references
05/13/08 Correction to title - single phase 4 wire to single phase 3 wire
04/07/08 New Sketch |
| 73 |
05/13/08 Updated title
04/07/08 New Sketch |
| 80 |
12/05/08 Corrected spelling error. Corrected incorrect reference in the drawing
04/07/08 New Sketch |
| 81 |
05/13/08 Note one changed can to shall
04/07/08 New Sketch |
| 82 |
12/05/08 New Sketch - Typical Arrangement of Outdoor Metering Equipment on Building from Overhead Distribution. Three Phase 277/480Y Volts Self Contained 200A. Combination Circuit Breaker/Meter Base |
| 83 |
12/05/08 New Sketch - Typical Arrangement of Outdoor Metering Equipment on Building, Lateral from Overhead or Underground Distribution. Three Phase 277/480Y Volts Self Contained 200A. Combination Circuit Breaker/Meter Base |
return to top
| Sketch # |
2007 Changes, Updates and Additions |
| 1 |
08/17/07 Updated format, content, and added notes |
|
3 |
0817/07 Updated format, content, and added notes
02/26/07 Corrected Error in Span Length Information |
| 3A |
08/17/07 Updated format, content, added notes, and split drawing into two sheets |
| 5 |
08/27/07 Updated format, content, revised title, and added notes |
| 5A |
08/13/07 VOIDED - See Sketch 6 |
| 6 |
08/17/07 Updated format, content, revised title, and added notes |
| 7 |
08/17/07 Updated format, content, revised title, and added notes |
| 7A |
08/17/07 Updated format, content, and added notes
02/26/07 Added No Attachment Sticker To Sketch |
| 8 |
08/17/07 Updated format, content, revised title, and added notes |
| 10A |
08/13/07 Updated format, content, revised title, split drawing into two sheets |
| 12 |
08/13/07 Updated format, content, revised title, split drawing into two sheets |
| 14 |
08/17/07 Updated format, and revised graphic |
|
16A |
02/01/07 Specified in note 9 that the neutral bar and all metallic conduit must be bonded together and to the cabinet. |
| 17 |
08/17/07 Updated format, content, revised title, and added notes |
|
25A |
04/16/07 Format updated. |
return to top
| List of Changes - Customer Reference Specifications |
| 2008 Changes to CRS's are: |
6-18-115 Installation Instructions for Customer-Installed Conduit Systems on PPL Terminal Poles
- 03/31/08 A new conduit bracket has been added to section 115
- 03/31/08 New number Replacing CRS 402C-115 which replaced CRS-1005
|
6-22-187 Installation Instructions for 3-Phase, 200 AMP Switchgear Foundation
- 11/21/08 New number to follow the standards format and to align current equipment installation requirements to field conditions, Replacing CRS 406C-187 which replaced CRS-1006
|
6-22-197 Installation Instructions for 3-Phase, 600 AMP Switchgear Foundation
- 11/21/08 New number to follow the standards format and to align current equipment installation requirements to field conditions, Replacing CRS 406C-197 which replaced CRS-1007
|
6-22-198 Installation Instructions for Precast Concrete Foundation for 3-Phase Pad-Mounted Manual or Automatic Source Transfer Switch
- 11/21/08 New number to follow the standards format and to align current equipment installation requirements to field conditions, Replacing CRS 406C-198
|
6-22-199 PPL EU Ultra Service Park Typical Utility Plan
- 11/21/08 New number to follow the standards format and to align current equipment installation requirements to field conditions, Replacing CRS 406C-199 which replaced CRS-1008
|
return to top
01/2009 |